BLUECUBE MODULAR REVERSE OSMOSIS WATERMAKERS
.png)
Your Project Can’t Afford Documentation Churn
EPC teams fight the same villain: redlines, missing datasheets, and non-AVL parts that stall reviews.
Late clarifications and incomplete packages create delays, change orders, and uncomfortable client calls. Bluecube skids are engineered to clear reviews on the first pass—so milestones hold and the critical path stays green.
-
-
Strict specs, AVL adherence, class/HazLoc, and single-lift preferences—all accounted for up front.
-
Bid-tab clarity for Leads, clean acceptance for Package Engineers, schedule confidence for PEMs, confirmed lead times for Procurement.
-
You shouldn’t have to choose between compliance and schedule.
-
Trusted Offshore. Proven Worldwide.
H2O supports greenfield platforms and FPSOs with spec-compliant, single-skid watermakers engineered for EPC delivery: AVL-aligned components, distributed inspections, module-level FAI, and FAT that feels routine—not heroic.
Our track record is simple: First-pass submittals. Lift-ready installs. On-time turnover.






Meet Bluecube RO — The Skidded & Engineered Watermaker
Single-skid. Spec-aligned. Lift-ready. Built specifically for offshore EPC.
Bluecube RO solves the exact challenges EPC teams face—without engineering exceptions or documentation churn. From compliance matrix to final SDRL, the package arrives complete and ready for crane placement.

Engineered for EPC Reality
- Single-Skid, Lift-Ready Layout
Defined footprint, lift points/CoG, utilities, and tie-ins for clean model fit and yard day. - AVL & Certification Alignment
Components from approved vendor lists; class/flag and HazLoc documentation embedded in the SDRL. - First-Pass Submittals
Compliance matrix, preliminary layout, and document register—structured for your review workflow. - RapidFlow™ Parallel Execution
Module-level assembly, testing, and distributed inspections compress schedules and de-risk FAT. - FAT-Tested, Commission-Ready
Verified performance before shipment; smoother commissioning and turnover.
.png?width=1200&height=1200&name=H2O%20WEBSITE%20SQUARES%20(4).png)
A Simple Path to First-Pass Approval
The Cost of Doing Nothing Adds Up Fast
When suppliers bring exceptions or thin submittals, schedules slip and costs climb:
-
Redlines and rework cycles
-
Late certifications and missed milestones
-
Field modifications and commissioning surprises
Choose a package engineered for first-time approval and predictable delivery.
.png)
With BlueCube RO, Your Project Runs Smoother
- Leads get concise, comparable tech packages
- Package Engineers clear client review faster
- PEMs protect the critical path
- Procurement locks lead time with AVL-compliant supply
That’s what predictable EPC delivery feels like.
Specification Overview

- Capacity Range: 5–130 m³/day (1,370–34,300 gallons/day)
- Pretreatment: Oversized pleated prefilters (10x service life vs. standard), optional bag and media filters for silt-heavy or shallow intakes
- Membranes: Siltbuster™ low-fouling membranes with 20% larger feed spacer; 1,200 PSI side-ported fiberglass membranes with duplex connections
- Piping & Hardware: Duplex stainless axial pump, duplex HP piping, 316L SS hardware, epoxy-coated steel frames
- Monitoring & Control: Continuous salinity monitoring with auto dump, system health indicators (red/yellow/green gauges)
- Recovery Rate: <40% typical for seawater range 32,000–45,000 ppm TDS
- Utilities: 208–480V 3ph/50 or 60Hz
Options & Upgrades
INLET & PRETREATMENT
PREFILTRATION UPGRADES
CONTROLS AND INSTRUMENTATION
COMPLIANCE
-
Class/Flag: ABS/DNV/BV documentation aligned to project requirements
-
Hazardous Area: IECEx/ATEX/CSA-UL options with evidence in the SDRL
-
Document Control: Structured to your SDRL/VDRL for first-pass reviews
Frequently Asked Questions