POTABLE WATER STORAGE — Skidded & Engineered / EPC
Single-lift packages with defined footprint, tie-ins, and complete SDRL/VDRL.
POTABLE WATER 05

Your EPC Can’t Afford Review Churn

Schedules slip when storage packages arrive with exceptions, thin submittals, or vague nozzle data. Our skids are engineered for first-pass approvals: AVL alignment, complete appurtenance list, lift points/CoG, and a structured SDRL to keep milestones green.

  • Spec-aligned submittals — compliance matrix, GA + nozzle schedule, utilities, coatings.
  • AVL & potable evidence — lining approvals and materials traceability inside the SDRL.
  • Lift-ready layout — single-skid footprint, tie-ins, and handling data for yard day.

Trusted on Offshore Greenfield Projects.

Spec-aligned submittals and lift-ready layouts that keep reviews calm.

5-2
6-1
4-Nov-04-2025-08-30-21-4055-PM
2-Nov-04-2025-08-30-21-3532-PM
3-Nov-04-2025-08-30-21-2649-PM
1-Nov-04-2025-08-30-21-2647-PM

Meet H2O Potable Storage — the EPC skid.

Spec-aligned. Documented. Ready to lift.

POTABLE WATER TWO

Engineered for EPC Reality

  • Single-skid, lift-ready — defined footprint, lift points, CoG/weights, tie-ins.

  • Complete appurtenances — vents/overflows, drains, manway(s), level, sampling.

  • Potable lining package — approved internal lining; evidence embedded in the SDRL.

  • FAT-tested & shipyard-ready — preservation and shipping dimensions included.

POTABLE WATER ONE

A Simple Path to to First-Pass Approval

1. Send specs & Timeline
Align on AVL, linings/coatings, SDRL/ITR before engineering.
Learn more
2. Engineer & Document
compliance matrix, GA/nozzle schedule, utilities, lift/CoG
Learn more
3. FAT, lift & Turnover
system FAT as specified; single-lift installation; O&M handover
Learn more

The Cost of Doing Nothing Adds Up Fast

When watermaking equipment fails offshore, the entire operation pays the price:

  • Redlines at owner/class review
  • Model clashes and re-routes
  • FAT delays and commissioning surprises

Reliable freshwater shouldn’t be optional—it’s essential to safe, continuous offshore operations.

H2O WEBSITE SQUARES (6)

With H2O, EPC delivery stays predictable

Leads get bid-tab clarity; Package Engineers close reviews faster; PEMs protect milestones; Procurement locks lead time with AVL supply and lining approvals.

Specification Overview

H2O WEBSITE SQUARES (11)
  • Volume range: Sized to process demand and model envelope

  • Skid format: Single-lift with defined footprint/tie-ins; weights & CoG documented

  • Appurtenances: Vent/overflow, drains, manway(s), level (transmitter/switch/sight), sampling

  • Lining & coatings: Potable-approved internal lining; offshore-duty external system

  • Docs: SDRL/VDRL, compliance matrix, GA/nozzle schedule, lift/CoG, preservation/shipping dims, O&M

Options & Upgrades

Recirc/UV/chlorination packages

Level redundancy/voting

Heat trace/insulation

Additional access ports

Instrumentation/I/O to DCS

COMPLIANCE

  • Potable: NSF/ANSI 61 lining/wetted path evidence
  • Quality: staged inspections/FAT
  • Docs: SDRL/VDRL structured for first-pass review

Frequently Asked Questions

What’s in the submittal?
Compliance matrix, GA + nozzle schedule, utilities, lining/coating data, lift/CoG.
Can you meet our AVL and lining requirements?
Yes—AVL parts and potable lining approvals are documented in the SDRL.
How do you protect schedule?
Early, complete submittals and lift-ready layout reduce RFIs and rework.
Who is this for?
Leads, Package Engineers, PEMs/PMs, and Procurement executing offshore greenfield projects.

Get Reliable Freshwater Back on Your Platform

Serving offshore operators for over 20 years. Proven in the Gulf of Mexico and worldwide.